In October of 2017, Articon started the work of pouring concrete for the floors at Glasir. The total floor area for the 6 floors was approx. 13,000 m2.

In February of 2018, work started on the great concrete stairs, which is the main gathering place in the school. The stairs consist of 42 steps, the longest step being 22 metres long. The stairs begin on the 1st floor and end on the 3rd floor. The total surface area is approx. 1,400m2.

Ramps have been made between steps in order to make the stairs wheelchair accessible. Sustainable construction was practised as much as possible during the making of the stairs. The challenge lay in the fact that each step is unique. Therefore, new concrete forms had to be made for each step and ramp. Each concrete form was used 3-6 times.


10Feb21 84A5235 Pano 10Feb21 84A5231 1024 10Feb21 84A5205 10Feb21 B3A6375 1024Px 10Feb21 84A5197 1024Px 10Feb21 84A5189 1024Px